|
Technical & General Information
Standard branch angles: 45, 60, 90, and specific angles upon request
Extended stuffing box to eliminate dead space and to improve stem/disc alignments is standard
The live loaded packing arrangement included as a standard
Optional purge connections are possible to flush the valve and to clean downstream
Optional ¼” that can be used for leak detection or insert gas injection to avoid leakage to atmosphere by creating on over pressure
Disc Rising or Lowering design available
|